STYCCOBOND F49 HYBRID PS Vinyl Adhesive

STYCCOBOND F49 HYBRID PS Vinyl Adhesive
FileSize
F49_TechDataSheet_GB.pdf631.53KB Download
F49_Base_SafetySheet_GB-1.pdf160.39KB Download

Styccobond F49 – Temperature Tolerant Pressure Sensitive Vinyl Adhesive

Type: Water-based hybrid PS adhesive
Application: Vinyl floorcoverings
Temperature Range: -20°C to +60°C
Compatibility: Conservatories, floor-to-ceiling window areas, underfloor heating

STYCCOBOND F49 is a high-performance, temperature-tolerant, water-based pressure sensitive adhesive formulated for bonding vinyl floorcoverings in areas exposed to extreme temperature fluctuations. Its dual-component hybrid chemistry ensures a strong initial tack and durable bond, even in challenging environments like conservatories and sunlit rooms.

Key Features:

  • High temperature tolerance: Withstands -20°C to +60°C

  • Strong initial tack & high bond strength

  • Bio-degradation resistant

  • Compatible with underfloor heating systems

  • Ideal for vinyl in glazed, high-temp areas

  • Two-component formulation for optimal strength

Suitable For:

  • Conservatories

  • Floor-to-ceiling glass areas

  • Interiors with underfloor heating

  • Locations with wide temperature variation


    Coverage:

    Up to 6m² per kg using a STYCCOBOND FINE NOTCH (A1) trowel.

    Styccobond F49 Hybrid PS is an ideal solution for installations requiring a resilient adhesive capable of withstanding challenging temperature conditions while providing strong, lasting adhesion for vinyl floorcoverings.


    Mixing Instructions:

    1. Mix Only Full Packs: Ratios are critical; do not mix partial quantities.

    2. Combine Components: Empty the entire contents of the PS Activator container into the Base container.

    3. Initial Mixing: Using a power whisk attached to a slow-speed electric drill, mix until a uniform colour and consistency are achieved.

    4. Scrape and Continue Mixing: Scrape the sides of the container and mix for an additional 2–3 minutes to ensure thorough blending.

    Application Instructions:

    1. Subfloor Preparation: Ensure the subfloor is structurally sound, smooth, dry, and free from contaminants.

    2. Apply Adhesive: Using a STYCCOBOND FINE NOTCH (A1) trowel, spread the adhesive evenly over the subfloor at a 60° angle.

    3. Drying Time: Allow the adhesive to dry to a tacky film before installing the floorcovering. Drying time is approximately 20 minutes, depending on temperature, humidity, and subfloor absorbency.

    4. Install Floorcovering: Lay the floorcovering into the adhesive, pressing from the centre outwards to exclude air and ensure overall contact.

    5. Roll the Floorcovering: Use a 68kg flooring roller to roll the floorcovering from end-to-end and side-to-side. Re-roll as necessary to maintain contact.


      For a visual guide on mixing and applying Styccobond F49 Hybrid PS, you may find the following video helpful:


Enquiry Form

Write a review

Please login or register to review

Standard Shipping - 2 to 5 Working Days*
Express Delivery - 1 to 2 Working Days*
Pallet delivery - applied for products that are too large, like flooring machines, flooring materials, ETC.

Most products will be delivered via third party courier (Royal Mail, UPS, APC, DX), depending on the weight, size and product value.
Orders received by 12:00am are processed the same working day.
Your delivery charge will be displayed in the Shopping Cart page and Checkout prior to purchase.
Once the order has been dispatched you will be sent relevant tracking information.

 

THANK YOU FOR TRUSTING OUR BUSINESS!

For Urgent Deliveries, please feel free to contact us prior to ordering.

*All delivery times are subject to availability.

  • £33.52

Available Options

International Shipping

We are now delivering to the EU and USA. Please use the product enquiry tab below and we will get back to you with a bespoke delivery price.

Tags: STYCCOBOND, F49, HYBRID, PS, vinyl, adhesive, lvt

Product Guidance

Choosing the Right Product for Your Flooring Project

Every flooring project is different. Before ordering, consider the flooring material, the type of installation or preparation work involved, and whether the product is suitable for your intended application.

01

Check the Application

Review the product description and specifications to confirm that the product is designed for the task you are completing.

02

Check Compatibility

Check all relevant measurements, fittings, machine models, flooring types and material requirements before placing your order.

03

Consider What Else You Need

Some flooring jobs may require additional tools, blades, accessories, fixings, adhesives, safety equipment or preparation products.

04

Follow the Instructions

Always follow the manufacturer’s instructions and use the correct safety equipment when installing, operating or handling flooring products.

Need Help Choosing?

Unsure whether this product is right for your project? Our team can help you compare options and check product suitability before you order.

Ask Our Team

Newsletter Signup

×
Signup to our newsletter for latest news and special offers

* E-Mail:

Newsletter Signup

×
Signup to our newsletter for latest news and special offers

* E-Mail: